Intervention in the absence of SCIA, what does it involve? Consequences and sanctions
There Certified Report of Start of Activity (SCIA) it is an administrative act necessary for the start of certain building interventions. His omission can result
There Certified Report of Start of Activity (SCIA) it is an administrative act necessary for the start of certain building interventions. His omission can result
The POROTON® fire walls they are a safe and efficient solution for the construction of fire-resistant buildings. The Poroton Italia® Consortium has updated the technical
The construction contribution it is often subject of dispute between citizens and the technical office and, consequently, it represents an always interesting subject in the
There economic management of the project in a BIM environment represents a challenge and an opportunity for improve the reliability of estimates And ensure the
What are the zero costs? One of the main innovations introduced is theelimination of charges previously provided for the consultation of the cadastral databases. This
Sustainable comfort The design and construction of buildings capable of satisfying increasingly complex and unprecedented demands for quality of life and living require an original
Hypar it’s one generative design cloud platform which allows you to generate design layouts And analyze and optimize project performance in a few steps. Among
Consolidation manual with composite materials This brand new manual aims to photograph the current situation relating to the use of composite materials for the renovation
Main regulatory changes Requirements for participation in tenders (art. 32): the amendment to the Code introduces an extension of the time frame for the technical
The seismic regulations of the 70s and 80s In the era of reconstruction by the greats seismic events of the 70s and 80s (earthquakes in