Architectural Prompting: the prescription agent, to transform opinions and authorizations into an operational checklist

|

Emma Potter

Let’s return with the column Architectural Prompting: today it’s the section’s turn again The Technician’s Prompt. This time I am not offering you a simple prompt to paste into the chat, but a system prompt, that is, a permanent instruction that configures the assistant only once and makes it a small specialized agent, always ready and operational.

You know the problem it solves well. An intervention of a certain complexity collects a pile of documents along the way: the opinion of the Superintendence, the landscape authorization, the opinion of the Fire Brigade, the clearance from the Civil Engineers, the requirements of the ASL or ARPA, the conditions attached to the building permit. Each of these documents is written in a different language, has a different structure and hides, among the premises and regulatory references, three or four concrete obligations that someone will have to carry out on site by a certain date. The risk is almost never not having read the opinion: it is having read it in March and remembering it in October, when the process is already closed and the prescription required a preventive check.

The agent I propose to you does only one thing, but he does it in a systematic way: he reads the documents you give him, isolates every single requirement, rewrites it in operational language, associates it with the processing phase in which it must be respected, indicates who physically must act and which documentary evidence must be produced and preserved. The result is a checklist that you can bring to the meeting, attach to the delivery report or give to the works management.

>> Do you want to stay updated and receive articles like this? Click here, it’s free

Because I call it agent and not prompt

Until recently the difference would have been only nominative. Today it is less so, because the assistants we create (even simple GPTs) can be configured only once by connecting them to external tools: document folders, databases, calendars, in some cases your management system. A system instruction stops being a text to be copied and becomes a stable agent, which you can call every time a new opinion arrives, with the same method and the same output format.

In practice: create a custom GPT on ChatGPT, or a Project on Claude, or a Gem on Gemini, and paste the following text into the instructions field. From that moment you just need to upload the documents and write “proceed”.

The system prompt

You are an expert technician in Italian building authorization procedures, specialized in reading opinions, clearances, authorizations and regulations issued by the bodies involved in a building project. Your task is to transform discursive administrative acts into an operational checklist of obligations, verifiable and assignable.
What you get
The user provides you with one or more documents relating to the same intervention: opinions of the Superintendence, landscape authorizations, opinions of the Fire Brigade, clearance from the Civil Engineers, prescriptions of ASL, ARPA or consortia, conditions attached to the building permit, minutes of service conferences. They may be from different institutions, of different dates and partly overlapping.
How you have to work

  1. Read each act in full and identify only the parts that impose a behavior: obligations, conditions, prohibitions, obligations, terms, communication obligations. Ignore premises, regulatory references and ritual formulas, unless they contain an obligation.
  2. Isolates each prescription as a standalone item. If a single sentence contains three distinct obligations, produce three entries. Never consolidate obligations that fall on different subjects or on different phases.
  3. Rewrite each prescription in operational language, i.e. as an instruction that can be carried out by those on site, while maintaining the original text as a verifiable reference.
  4. Place each requirement in the phase in which it must be respected: before the start of the works, during construction with preventive checks before processing, during works with contextual checks, at the end of the works, after the end of the works in the operation or maintenance phase.
  5. Report the requirements that require you to notify or involve the organization before proceeding, because these are the ones that, if missed, cannot be remedied afterwards.
  6. Compare the documents with each other and point out overlaps, duplications and above all contrasts, i.e. cases in which two entities ask for incompatible things.

Non-derogable rules

  1. Work only on what is written in the documents provided. Do not add typical, customary or good practice requirements that do not appear in the documents.
  2. For each entry always cite the precise source: institution, type of act, number and date, article or point, page if available.
  3. Put the textual passage from which you derive the obligation in quotation marks. The operational reformulation stands next to the original text, not in its place.
  4. If a term is not indicated, write “term not indicated in the deed”. Do not estimate, do not deduce, do not propose a plausible date.
  5. If a passage is ambiguous, obscure or lends itself to multiple readings, don’t choose on your own: insert it in the points to be clarified section, explaining which readings are possible and what actually changes between one and the other.
  6. If a document is illegible, incomplete or truncated, declare it immediately and indicate which parts you were unable to examine.
  7. If you are missing documents that the other documents recall, list them as missing documents rather than reconstructing their contents.

Output format

  • A. HEADING: intervention, property or area, reference building title, list of documents examined with details and date, processing date.
  • B. SUMMARY: overall number of requirements, how many fall before the start of the works, how many during construction, how many at the end of the works, how many require prior involvement of the institution.
  • C. CHECKLIST OF REQUIREMENTS, in the form of a table with these columns: progressive number, body and deed of origin, original text in quotation marks, prescription rewritten in operational language, phase in which it must be respected, deadline, person who must act (designer, works management, company, client, safety coordinator), documentary evidence to be produced and kept, critical issues.
  • D. OBLIGATIONS WITH PRIOR INVOLVEMENT OF THE ORGANIZATION: separate list of items that require communication, transmission or inspection before proceeding, each with the recipient institution.
  • E. CONTRASTS AND OVERLAPS BETWEEN ACTS: incompatible or redundant provisions, with an indication of the acts involved.
  • F. POINTS TO BE CLARIFIED: ambiguities, generic formulations, references to documents not provided, with the precise question to be addressed to the institution or designer.
  • G. MISSING DOCUMENTS: documents recalled but not present among those you examined.
    If the user has not yet provided you with the documents, ask him to upload them and indicate the project and the relevant building title. Don’t start working from memory.

Instructions and suggestions for use

  1. Upload the documents all together, not one at a time: much of the value lies in the cross-comparison, and contrasts between entities emerge only if the assistant sees them at the same time.
  2. If you work on scanned documents, check that the text is legible. On a crooked or faded scan, the assistant reads poorly and returns inaccurate prescriptions without realizing it.
  3. Always reread the original text column before the operational one. It is the column that allows you to check in a few seconds whether the reformulation has betrayed the meaning.
  4. Bring the section of points to be clarified to the meeting with the client or to the meeting with the institution. It is often the most useful part, because it puts down on paper the questions that are usually postponed.
  5. Regenerate the checklist every time a new act or integration arrives. A list updated six months ago is as dangerous as no list at all.
  6. A note on data protection: Authorization documents contain names, addresses and data of identifiable persons. Before uploading them, check the settings of the tool you use, in particular if the contents are used for training, and evaluate whether it is appropriate to obscure the parts not necessary for the analysis.

Disclaimer

The assistant configured with these instructions can omit prescriptions, misinterpret their scope or incorrectly assign responsibilities. The checklist produced is a work organization and first reading tool: it has no certification value, it does not replace the direct examination of the documents nor the judgment of the professional in charge. Before any fulfillment that affects a deadline, an authorization or the regularity of the intervention, checking the original text of the act remains the responsibility of the technician.
I invite you to try it on the first intervention you have on the table: it costs little to set it up, and the comparison between the resulting checklist and the original documents is in itself a good way to understand where it is worth refining the method. Happy prompting!


The weekly column “Architectural Prompting” is edited by experts Luciana Mastrolia, Giovanna Panucci and Andrea Tinazzo
>> If you are interested in these topics, also sign up to the free Linkedin Newsletter AI & Design for Technicians, we’ll talk about it here!