Development rights
In this perspective, building rights are placed in an intermediate position between the private domain sphere and the public regulation of building activity: they belong to private assets and can be the subject of dispositive acts, but their concrete exercise remains subject to verification of compatibility with the urban planning regulations in force at the time in which they are used.
The circumstance that the building right has patrimonial content, and as such is subject to contractual transfer contributing to the formation of the price, does not therefore entail the removal of the conforming power. In reality, like the purchase of building land, the purchase of space also implies the assumption of a risk by the buyer, as the possibility of using the building rights will still have to be confirmed in future urban planning regulations.
In other words, development rights have a dual dimension:
– on the one hand, a private dimension, in that they are economically appreciable and transferable utilities through the tools of negotiating autonomy;
– on the other, a public dimension, since the methods of their use necessarily depend on the existing and existing urban planning regulations.
The circulatory autonomy of development rights does not determine any securitization, and does not create a legal position definitively shielded from the exercise of planning power.
The volume transfer contract
The above clarifies the cause and effects of the volume transfer contract, with which the owner of a land detaches, in whole or in part, the building authority inherent in his own land and transfers it to the owner of another land, resulting in an increase in the building capacity of the latter and a corresponding reduction in that of the former (2).
The effect produced on a private level involves the transfer, by way of derivative, of the building capacity from the transferring fund to the transferring fund; from that moment the transferred volume becomes part of the legal qualities of the landing fund, expanding its abstractly usable building potential.
Nonetheless, the contract does not in itself legitimize the construction case. The possibility of using the transferred volume is an effect that remains subordinate to the exercise of the authorization power, as it is necessary that the building intervention be approved in compliance with the urban planning regulations in force at the time of the request for the title.
The role of the administration
The administration remains extraneous to the transfer transaction and is in no way bound by the decisions taken by private individuals regarding the future use of the transferred volume; it is called upon exclusively to verify, at the time of exercise of the ius aedificandithe conformity of the intervention with the applicable urban planning and building regulations.
Unless the administration has signed up to the agreement between private individuals, giving it public significance, the transfer of space does not determine the crystallization of the urban planning conditions necessary for the use of building rights, which continue to depend on planning choices. Opining differently, private individuals, through the exercise of negotiating autonomy, would be able to remove entire portions of the territory from the conforming action of the planning body, making the urban planning destinations and building parameters impervious to subsequent evaluations of public interest. Such a conclusion would lead to a rapid exhaustion of the urban planning function, which is by its nature dynamic and aimed at adapting planning choices to the changing needs of the community.
The risk underlying the transfer of building rights through the transfer of air space
Distinguishing the profile of the acquisition of building rights from that of its concrete usability, and tracing the former back to the circulation of the right in the private sphere and the latter to the conforming power of the administration, according to the TAR Lombardia, Brescia, section. II, in the sentence. 17 November 2026, n. 1577, it must be considered that, until the building capacity is concretely exercised through an agreed transformation of the territory, it continues to fall within the scope of conformability by the planner; it follows that the building rights transferred through the transfer of space never take on the characteristic of vested rights for the preservation of the urban planning regulations existing at the time of the transfer.
As highlighted by the judges, the building right deriving from the transfer of space has an inevitably composite matrix: it finds its immediate source in the negotiating autonomy of private individuals, but its concrete exercise remains subordinate to the urban planning regulations in force and to the conforming power vested in the Administration.
Therefore, the volume acquired through the transfer of volume integrates a legal quality of the land only as long as the urban planning regulations allow it, without being able to give rise to a definitively acquired right removed from the jus superveniens.
The waiting time until the necessary building permit is obtained and the intervention is carried out exposes the owner to a risk, as the building rights remain in the sphere of the mere potential for exploitation of the land and, as such, are susceptible to being affected by subsequent planning choices. Only the use of building capacity through a building permit is suitable for determining the consolidation of the owner’s position, making building rights no longer subject to subsequent changes in urban planning regulations.
In the specific case examined by the Brescia judges, there had been an act of transfer of capacity way back in 1993 and this increase in capacity had never been exercised; this circumstance, according to the judges, cannot prevent the municipality from subsequently regulating the urban planning area, excluding, in the calculation of the maximum limit of the permitted volume of a lot, the building capacity which, although transferred on the negotiating level, had not yet been exercised on the urban-building plan.
>> If you want to receive news like this directly on your smartphone, subscribe to our new Telegram channel!
Notes
(1) Cass., SS. UU. civil, 9 June 2021 n. 16080.
(2) Council of State, sec. VI, sentence. 2 September 2024, n. 7348: “The Plenary Meeting of the Council of State, with decision no. 3 of 2009, qualified the servitude restriction on building land as an atypical contractual case with obligatory effects on the basis of which an area is intended to be used to calculate the buildability of another land.
In particular, according to the ruling of the highest body of administrative justice, servitude creates a particular type of appurtenant relationship, in which the building quality of another fund is placed permanently at the service of one land.
The purpose of the regulatory provision and of the act of subservience implementing it, therefore, is to increase the available volume on a land, taking advantage of the granted and unused volume, towards another land in the same area, which is consequently subject to the restriction of non-buildability.
In other words, the land servitude constraint involves the transfer of volume between contiguous lands and is functional to increasing the building potential of an area through the use of the volume that can be achieved in a contiguous parcel and the consequent calculation also of the surface area of the latter, for the purposes of verifying compliance with the land buildability index.
The building subservience between funds, therefore, regardless of the common ownership of the two lands, implements the “transfer” of the building space of one fund in favor of another fund, so that, with the resulting overall volume remaining unchanged, the transferring land will be characterized by a building index higher than that originally enjoyed.
The building use of the land for the purposes of issuing a building permit does not determine a constraint of absolute non-buildability on the land served, instead producing the non-usability of the portion of building potential produced by the land itself and used for building purposes.
Therefore, if the servitude land retains a buildable portion, as it has “surrendered” part and not all of its buildable portion for the issuance of the building permit, the buildability of the same could not be excluded for the residual portion.”
In collaboration with studiolegalepetrulli.it
Thank you for subscribing to the newsletter.