Expensive materials 2024: increased resources but risk forecasts for construction
Dear Materials 2024: Increase in Resources The original allocation for this measure was EUR 2,480.6 million, including EUR 1.73 billion of residual funds and EUR
Dear Materials 2024: Increase in Resources The original allocation for this measure was EUR 2,480.6 million, including EUR 1.73 billion of residual funds and EUR
The technician’s responsibilities Compared to the initial version of May 30, 2024, the following changes have been made: changed some points which have taken into
Photovoltaic Systems The volume is a complete guide i) to the design of grid-connected photovoltaic systems, also equipped with storage systems, ii) to the presentation
Public Contracts after the New Code (Legislative Decree 36/2023) The Manual is an excellent tool for preparing and updating on the Public Contracts Code in
ASSISTAL’s concerns According to Eng. Roberto Rossi, the draft decree on administrative regimes for the production of renewable energy does not facilitate the development of
Digital training and skills Training plays a vital role in ensuring that businesses can get the most benefit from new technologies and innovative processes. As
The concept of conservative acts The concept of conservative acts includes everything that aims to preserve the integrity and existence of the common heritageincluding in
Guide to Security Plans 2.0 English: The guide is updated with the chapter “Integration to Safety Plans – Covid-19 Risk” edited by Marco Ballardini and
What the rules provide L’Article 16-bis of the TUIR regulates tax deductions for building heritage recovery interventions. These benefits allow for deduct a percentage of
The recent ruling of the TAR Campania, Salerno Let’s see the sentence of 11 July 2024, n. 1464, of the TAR Campania, Salerno, section II.