The silent consent of the Save-Home Decree and the role of the professional
The role of the professional in the different phases of the procedure Analyzing the process of the new conformity assessment of theart. 36-bis of the
The role of the professional in the different phases of the procedure Analyzing the process of the new conformity assessment of theart. 36-bis of the
Sunday 16 June, from 10:00L'Arch. Alberto Fabio Ceccarelli will be live online with an Extraordinary Lesson dedicated to the 1st session of the 2024 qualification
How to calculate the achievement of annual objectives For the calculation of the achievement of the annual objectives, specified in the Table A, takes into
The new regime of manufacturing tolerances The decree basically confirms the concept of manufacturing tolerances i.e. the deviation in height, separations, volume, covered surface area
The summary table and the technical note commenting on ANCE Here is a brief summary of what the Salva-Casa provides. The summary table and the
Responsibilities of the construction manager It must be considered that the behavior of the works manager must be evaluated not with reference to the normal
What is WEEE? WEEE waste indicates the category of all waste equipment that depends on electricity to function, both as a user and as a
It's time to 730/2024as we know and as we have seen in numerous articles in recent weeks (>> you can find them all here): since
Minimum dimensions and equipment The requirements for the construction of a bathroom are those contained in theart. 7 of the Health Ministerial Decree of 5
Photovoltaic Systems The volume is a complete guide i) to the design of grid-connected photovoltaic systems, including those equipped with storage systems, ii) to the